How a Support Coordination Team Reduced Plan Review Time by 60%Case study
·5 min read·Marcus Hale

How a Support Coordination Team Reduced Plan Review Time by 60%

A twelve-person coordination team standardized every participant plan against their org template for one quarter. Here is what changed.

A regional support coordination team of twelve coordinators and two team leads was drowning in participant plan reviews. Each draft arrived in a different shape — missing goal sections, inconsistent terminology, and formatting that took senior staff an hour to fix before sign-off.

The experiment

For Q4 2025, every inbound participant plan — 847 across the quarter — went through Documatch against the organization’s master template. Coordinators imported DOCX or PDF, ran guideline checks on flagged sections, and team leads reviewed proposed fixes block-by-block before export.

Results

  • Median time from draft receipt to approved plan: 3.1 hours → 1.2 hours (−60%).
  • Plans returned for missing mandatory sections: down 74% in the first month.
  • Senior reviewer reject rate on coordinator drafts: down 31% — guideline gaps surfaced earlier.
  • No silent section changes; every accepted fix has an audit trail via version checkpoints.

What didn't change

The team still does not auto-publish standardized language without human approval. Team leads accept fixes; coordinators do not. The platform shortened mechanical work — section completeness, terminology alignment, formatting consistency — not clinical or care-planning judgment.

"We didn't reduce oversight," said their operations lead. "We stopped paying senior coordinators to fix the same template gaps at 6 p.m. every Friday."

More from the blog